Applications desk

Contact JBT With Reviewable Freezing Inputs

Send product mix, target kg/h, temperature profile and hygiene documents. Unknown fields should stay blank rather than be filled with assumptions. This page is a full contact workspace—not the compact inquiry modal.

JBT applications center map illustration

Address

JBT Applications Desk
Food Processing Engineering Floor
Lakeland, Florida, United States

Hours & social

Monday–Friday
08:00–17:00 Eastern Time
LinkedIn

Contact details are site configuration values for this rebuild and require verification before public deployment. Do not transmit confidential recipes, passwords or uncontrolled drawings through the initial form.

Define the decision before asking for price

MOQ, installation windows and utility upgrades depend on freezer architecture, product trials and hygiene scope. A first response may contain clarifying questions rather than a quotation. Processors comparing an IQF tunnel against a spiral cage should state tray height, piece size distribution and packaging cycles per minute so the applications desk can reject mismatched architectures early.

  • Product pieces, trays or trolleys with dimensions
  • Infeed temperature and core acceptance target
  • Upstream blancher / washer constraints
  • Refrigeration plant type (ammonia / CO₂) and spare capacity
  • HACCP / GLOBALG.A.P. documents your auditors will request

Pricing comparisons need the same functional freezer, packaging takt, scrap assumptions and cold-store buffer. Nameplate kg/h alone can hide differences in glaze pickup, reject rates and sanitation downtime. If your grower network mixes drip-irrigated open field lots with Venlo greenhouse harvests, note the intake moisture and residue testing cadence—those agronomy variables change washer CCP limits before the freezer belt ever starts.

For retrofit projects, attach the current P&ID revision, belt width, known frost-load complaints and the last three CCP calibration dates. For greenfield projects, list floor-to-truss clearance, drain locations and whether ready-to-eat zoning must stay physically separated from raw vegetable wash. Unknown fields can remain marked TBD; invented numbers create false confidence in CapEx committees.

After the first reply, expect a shortlist of missing measurements rather than a brochure. Typical follow-ups cover evaporator duty assumptions, defrost interval, CIP coverage photos and who signs change control when packaging takt rises after the freezer ships.

Specification inquiry form

Two-column fields keep capacity and timing beside contact data so applications engineers can triage quickly.